Client: EMC Continental
Project:
Renewable Energy Solar Park Project
Date:
Mar 2015 - Oct 2015
Contract Sum:
US$ 150,000
The Renewable Energy Technology Park (RET Park) project is a proposed development located in the Middle Save region in Chipangayi, Zimbabwe that will see the construction of a photovoltaic power plant to generate a minimum of 50 Megawatts (MW) that will be added onto the national power grid system. Hydro-Utilities were commissioned by Lamont Consulting Engineers to undertake a civils feasibility study for this solar project. The study was successfully carried out.
Client: UNICEF
Project:
WASH in Schools End of Project Evaluation
Date:
Feb 2018 - Dec 2018
Contract Sum:
US$ 200,000
A UNICEF project supporting the National Action Committee for WASH in implementing WASH in satellite schools project in 3 districts (Binga, Mwenezi, Hurungwe) in Zimbabwe. The project involved the end of project evaluation of the WASH project and recommendations for improving project design for future
Client: Castalia Advisory Ltd (USA)
Project:
Water Assessment for 50 Small Towns
Date:
Jan 2014 - Dec 2014
Contract Sum:
US$ 470,000
A World Bank funded project that involved the carrying out of a water and sanitation needs assessment study for 50 small water supply stations in small towns across Zimbabwe. The project also included assisting ZINWA to prepare 7 priority projects for submission of bid documentation to enable ZINWA to take these projects for tender. The project was successfully carried out and presented to ZINWA in 2014.
Client: UNICEF
Project:
Capacity Building in 14 Towns -Zimbabwe
Date:
Oct 2017 - Dec 2018
Contract Sum:
US$ 600,000
A UNICEF project for providing Institutional consultancy services for supporting local authorities and ZINWA on general operations and maintenance of water and sanitation services. Assessment of technical and admin capabilities of LA’s. Hydro-Utilities were commissioned in association with hydrophil. The project successfully carried out and Final report issued to UNICEF in Dec 2018.
Client: Zimbabwe Borders
Project:
Beitbridge Town Water Assessment
Date:
Nov 2018
Contract Sum:
US$ 10,000
Hydro-Utilities were commissioned by Raubex Construction of South Africa to carry out a detailed water assessment study for the town of Beitbridge to determine the projected water demand and current water supply in line with proposals for the modernization and upgrade of Beitbridge Border Post
Client: Ministry of Water
Project:
Matebeleland Zambezi Water Project
Date:
1999
Contract Sum:
US$ 600,000
Carried out feasibility studies and design concept to provide Bulawayo with potable water. This project involved detailed surveys and concept designs of bulk water pipelines, pump stations and reservoirs to abstract raw water from the Zambezi River and supply treated water to the city of Bulawayo. This detailed study was carried out successfully in association with SWECO engineering consultants.