Client: Beitbridge Town Council

Project:

Water & Sewage Rehabilitation

Date:

May 2002 - Aug 2003

Contract Sum:

US$ 850,000

Hydro-Utilities were commissioned to carry out the detailed civil engineering design and construction supervision of the water and sewer systems augmentation project for Beitbridge Town. This project also included the design of an 11.4ML water storage reservoir and a 5km 400mm diameter steel pipe from the waterworks to the storage reservoirs.

Client: Victoria Falls Municipality

Project:

Engineered Landfil

Date:

Feb 2013 - Mar 2014

Contract Sum:

US$ 4,100,000

This project involved the design of a 15,000m3 engineered landfill site for Victoria Falls Municipality. Hydro-Utilities were appointed by Victoria Falls Municipality to carry out the civil scope, tender administration, contract management and construction supervision.

Client: Borrowdale Brooke

Project:

Water & Sewage Rehabilitation

Date:

Jan 2018 - Mar 2019

Contract Sum:

US$ 1,500,000

Design and construction supervision of a new 750m3/day sewage treatment plant for the Borrowdale Brooke Estate. Includes a bioreactor chamber, buffer tank, pump sumps, flow split chamber, drum filter, UV station and effluent recycling pipework. Hydro-Utilities commissioned by LWI and Sataaya.

Client: Verify Engineering

Project:

AUS Acetylene Gas Plant

Date:

Mar 2013 - July 2015

Contract Sum:

US$ 2,500,000

Hydro-Utilities were commissioned to carry out site investigations, structural and civil design, and construction supervision for an LP Gas Plant in Mutare. Project components included a 2,000m2 steel warehouse, office block, water tanks and associated civil external works.

Client: Ministry of Water Development

Project:

Magunje Water Treatment Works

Date:

2003 - 2005

Contract Sum:

US$ 16,000,000

As Project Engineers and supervisors, Hydro-Utilities led the design and construction supervision of a 350m3/hr water treatment plant to provide potable water for the town of Magunje and its surrounding areas. This project was funded by the African Development Bank and included the design and construction of a 6000m3 water storage reservoir and distribution and service pipeline networks

Client: Victoria Falls Municipality

Project:

Victoria Falls Convention Centre

Date:

Feb 2012 - Nov 2012

Contract Sum:

US$ 24,000,000

Commissioned by the Ministry of Public Works, Hydro-Utilities provided design services for civil design and construction supervision of a proposed new Convention Centre complex. The project included water supply, pumping stations, bulk water pipelines and extension of existing sewage treatment ponds.

Client: Gvt of Zimbabwe

Project:

Kuwadzana Housing Infrastructure

Date:

May 1999 - Jun 2001

Contract Sum:

US$ 4,600,000

Hydro-Utilities were commissioned by the Ministry of Local Government and National Housing in May 1999 to provide design consultancy and construction supervision services of the water and sewer reticulation and construction of a duplicate 600mm diameter sewer from Kuwadzana to Crowborough Treatment Works. The contract also included the provision of roads and stormwater drainage.

Client: City of Harare

Project:

Harare Drive Missing Link Road Project

Date:

1999 - 2003

Contract Sum:

US$ 10,000,000

The project involved the design and construction of an 8km stretch of road linking Second St/Golden Stairs junction and Borrowdale Road Junction. Hydro-Utilities were appointed in association with BCHOD Consulting Engineers. The project was successfully completed and handed to Harare City Council